Modernization and upgrade of transmission substations IFB Number-MUTS/ICB/2016-4

The JSC “Uzbekistan National Power Networks” has received a loan from the World Bank toward the cost of “Modernization and upgrade of transmission substations” project and it intends to apply part of the proceeds of this loan to payments for procurement of High-voltage and medium voltage equipment, ...
20 Sep 2019

Information on the award of a contract under the tender for the selection of a consultant

Name of Project: Power Generation Efficiency Improvement Project («Expansion of Talimarjan Thermal Power Station by construction of another two CCGT units with the total capacity of at least 900 MW»).
18 Sep 2019

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION)

Uzbekistan Electricity Transmission System Modernization and Market Development
18 Sep 2019

Terms of Reference for Preparation of Feasibility Study and Tender Documents for SCADA/EMS/RTU and Telecommunications for Uzbekistan National Power Networks (NES) JSC.

Uzbekistan National Power Networks (NES) JSC intends to hire a consulting company for preparation of feasibility study (FS) and tender documents for SCADA/EMS/RTU and Telecommunication project as well as assistance in vendors’ bid evaluation process.
16 Sep 2019

Modernization and upgrade of transmission substations IFB Number - MUTS/ICB/2016-12

Procurement of equipment and devices for substation maintenance IFB Number - MUTS/ICB/2016-12

12 Aug 2019

Uzbekistan: PIU Consultancy Services

Uzbekistan: PIU Consultancy Services

Personal cabinet

electricity consumers
  • Ease of payment for electricity
  • Informing SMS payments
  • Information SMS message
  • Controlling costs
Go to the cabinet
Click to listen highlighted text! Powered by GSpeech